1 | INVESTMENT PLANNING

Consultancy on property acquisitions or strategic leases, analysis and expertise to realise the client's space programme. Preparation of initial tasks with identification of related project parts and real needs for future design work

2 | CONCEPT & PLANNING

Functional space concept with furnishings and essential ergonomic variables (with weighted assessments for different plan versions). Lighting concept to emphasize zones and focal points. Descriptions of the starting task of the use scenarios of the room

3 | CONSTRUCTION Project solution

Construction-technological plans with internal wall and equipment connections. Ceiling lighting summary plans with geometry and essential couplings. Arrangement of switch groups, sockets and low-current devices (audio-video concept with solution proposals if necessary)

4 | BIM (Building Information Model)

Sub-model with 3D geometric elements and parametric objects in ifc format (as a starting point for the client's decisions to check the architectural-structural and special part design solutions in the aggregate model)

5 | LIGHTING DESIGN

The framework for the technical part of the lighting solution and the lighting scenarios supporting its use. 3d light simulations define luminaire characteristics and describe switching scenarios to convey the lighting design solution. Work descriptions are created to realize the lighting design

6 | Project design of the VIIMISTLUSE

Consolidated plans with decorative elements and special finishes. Floor tiles with trapezes, slopes and skirting boards. Combination tables with positions for lighting, finishing materials, sanitary fittings and fittings for openings. Important sections, views and details for construction procurement

7 | EXTREME CAVE project solution

Design of special furniture and additional design elements. Custom drawings for fitted furniture for wardrobes, built-in cupboards, utility rooms, kitchen furniture, etc. Project solution for internal opening fillings with special solutions

8 | SUPERVISION & REPRESENTATION OF THE CONTRACTING AUTHORITY

Representing the client during the construction period to resolve any issues that may arise during the finishing work. The author's supervision of the interior design and the lighting project includes appropriate consultations with the direct contractors of the works

9 | TARGET BUDGET

Analysis and consultations to achieve the target budget set by the Contracting Authority (optimisation if necessary). Assembling, specifying and preparing orders for ordering

10 | INSTALLATION PROCESS

Assembling of products approved by the customer + checking the design solution reflected in the orders. Service for the coordination of the installation of furniture and fittings on site (organisational project management)